Indiana Department of Transportation
State AgencyIN
Aug 5, 2026
Closes
Sep 2, 2026
Small Structure Replacement
Work includes small structure replacement. Description: 1 LS of construction engineering; 3 ea of inspection hole, deeper than 3 ft; 1 LS of mobilization and demobilization; 1 LS of clearing right-of-way; 60 CY of excavation, common; 1 EA of pump around; 1 LS of stormwater management implementation; 237 SY of subgrade treatment, type IC; 410 CY of structure backfill, type 2; 237 SY of geotextile for pavement, type 2b; 58 CY of compacted aggregate, no. 8; 120 ton of compacted aggregate, no. 53; 330 SY of milling, transition; 48 ton of QC/QA-HMA, 3, 58s, surface, 9.5 mm; 33 ton of QC/QA-HMA, 3, 58s, intermediate, 19.0 mm; 78 ton of QC/QA-HMA, 3, 58s, base, 25.0 mm. See attached file.