41071-221435 - Bridge reconstruction including culvert replacement, scour countermeasures, riprap, guardrail and approach work on M-50 over Bond Drain, Kent County.
Description: Bridge reconstruction including culvert replacement, scour countermeasures, riprap, guardrail and approach work on M-50 over Bond Drain, Kent County. Required DBE Participation: 0.00% Required SBP Participation: 5.00% Net Classification Required For This Project: ** 1819 Ea or 1819 Fa ** Completion Date: 11/12/2027 12:00:00 AM
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
0.11 mi of bridge reconstruction including culvert removal and replacement, scour countermeasures, drainage, and guardrail work on M-28 over tributary to the Laughing Whitefish River, Alger County. Required DBE Participation: 2.00% Required SBP Participation: 0.00% Net Classification Required For This Project: ** 2000 Ea or 2000 Fa ** Completion Date: 10/15/2027 12:00:00 AM
Bridge reconstruction including replacement with 36-inch x 49-inch prestressed concrete beams and approach work on Treat Highway over Black Creek, Lenawee County. This is a Local Agency project. Required DBE Participation: 0.00% Required SBP Participation: 3.00% Net Classification Required For This Project: ** 3125 Fa ** Completion Date: 9/24/2027 12:00:00 AM
The Michigan Department of Transportation is soliciting bids for bridge rehabilitation and approach work on Old US-27 over Holden Drain in Clinton County, Michigan. The work includes partial slab replacement, full-depth patching, substructure patching, and approach work. Responses are due December 4, 2026, under opportunity ID 19031-223486.
Bridge rehabilitation including epoxy overlay, deck patching, superstructure and substructure patching, replacement of expansion joints, drain castings and retaining wall, concrete surface coating, guardrail and approach work on US-31 over Bear Creek in the city of Petoskey, Emmet County. This project includes a 2 year concrete surface coating warranty and a 5 year epoxy overlay warranty. Required DBE Participation: 0.00% Required SBP Participation: 3.00% Net Classification Required For This Project: ** 3532 N9-1A ** Completion Date: 8/20/2027 12:00:00 AM
Key Contacts on this RFP
Decision makers connected to this RFP from Michigan Department of Transportation.
JRJean RuestmanAdministrator, Office of Passenger Transportation
*******@************
+1 (***) ***-****
CFCaitlyn FrenchBay Region Communications Representative