02041-221596 - 0.11 mi of bridge reconstruction including culvert removal and replacement, scour countermeasures, drainage, and guardrail work on M-28 over tributary to the Laughing Whitefish River, Alger County.
Description: 0.11 mi of bridge reconstruction including culvert removal and replacement, scour countermeasures, drainage, and guardrail work on M-28 over tributary to the Laughing Whitefish River, Alger County. Required DBE Participation: 2.00% Required SBP Participation: 0.00% Net Classification Required For This Project: ** 2000 Ea or 2000 Fa ** Completion Date: 10/15/2027 12:00:00 AM
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
Bridge reconstruction including culvert replacement, scour countermeasures, riprap, guardrail and approach work on M-50 over Bond Drain, Kent County. Required DBE Participation: 0.00% Required SBP Participation: 5.00% Net Classification Required For This Project: ** 1819 Ea or 1819 Fa ** Completion Date: 11/12/2027 12:00:00 AM
2.21 mi of concrete roadway reconstruction, water main, drainage work, guardrail, traffic signals, signing and bridge reconstruction and rehabilitation on several structures and pavement markings.
Alberta Transportation and Economic Corridors seeks proposals for replacement of culverts BF 77967-1 on Highway 88:04 over a tributary to Lesser Slave River near Slave Lake and BF 71327-1 on Highway 2:44 over a tributary to Athabasca River near Island Lake. Services include preliminary engineering, detailed design, contract tendering and administration, construction and fabrication supervision, post-construction services, and warranty inspection. Only the three shortlisted proponents identified in the posting may submit proposals.
The Michigan Department of Transportation seeks bids to rehabilitate the US-41 bridge over the Sturgeon River and the M-28 bridge over the Ontonagon River in Baraga and Ontonagon Counties. Work includes removing and replacing epoxy overlay, deck and substructure patching, expansion-joint and railing repairs, superstructure repairs, full painting, and associated approach work. The contract requires a five-year performance warranty on the epoxy overlay and a two-year warranty on bridge coating.
Key Contacts on this RFP
Decision makers connected to this RFP from Michigan Department of Transportation.
JRJean RuestmanAdministrator, Office of Passenger Transportation
*******@************
+1 (***) ***-****
CFCaitlyn FrenchBay Region Communications Representative