24011-221521 - Bridge rehabilitation including epoxy overlay, deck patching, superstructure and substructure patching, replacement of expansion joints, drain castings and retaining wall, concrete surface coating, guardrail and approach work on US-31 over Bear Creek in the city of Petoskey, Emmet County.
Description: Bridge rehabilitation including epoxy overlay, deck patching, superstructure and substructure patching, replacement of expansion joints, drain castings and retaining wall, concrete surface coating, guardrail and approach work on US-31 over Bear Creek in the city of Petoskey, Emmet County. This project includes a 2 year concrete surface coating warranty and a 5 year epoxy overlay warranty. Required DBE Participation: 0.00% Required SBP Participation: 3.00% Net Classification Required For This Project: ** 3532 N9-1A ** Completion Date: 8/20/2027 12:00:00 AM
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
Bridge rehabilitation including shallow overlay, full depth deck patching, superstructure repairs, substructure patching, barrier replacement, joint waterproofing and approach work on I-96 under Morrison Lake Road, Ionia County. The project includes a 2 year warranty on concrete surface coating. Required DBE Participation: 0.00% Required SBP Participation: 0.00% Net Classification Required For This Project: ** 2657 N9-1A ** Completion Date: 8/31/2027 12:00:00 AM
Bridge rehabilitation on two structures including removal of existing epoxy overlay, epoxy overlay, deck patching, expansion joint replacement, thrie beam retrofit, concrete rail post and rail balustrade patching, r4 railing post replacement, superstructure repairs, full paint, substructure patching and approach work.
Bridge rehabilitation including concrete deck patching, extension of steel pile encasements, substructure repairs, replacement of expansion joints, structural steel repair and beam end trimming, partial painting, temporary supports, slope repair, guardrail and approach work and on M-77 over the Manistique River, Schoolcraft County. Required DBE Participation: 0.00% Required SBP Participation: 0.00% Net Classification Required For This Project: ** 1208 Fa or 1208 N4 ** Completion Date: 9/24/2027 12:00:00 AM
RFP documents
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.