75051-217637 - Bridge rehabilitation including concrete deck patching, extension of steel pile encasements, substructure repairs, replacement of expansion joints, structural steel repair and beam end trimming, partial painting, temporary supports, slope repair, guardrail and approach work and on M-77 over the Manistique River, Schoolcraft County.
Description: Bridge rehabilitation including concrete deck patching, extension of steel pile encasements, substructure repairs, replacement of expansion joints, structural steel repair and beam end trimming, partial painting, temporary supports, slope repair, guardrail and approach work and on M-77 over the Manistique River, Schoolcraft County. Required DBE Participation: 0.00% Required SBP Participation: 0.00% Net Classification Required For This Project: ** 1208 Fa or 1208 N4 ** Completion Date: 9/24/2027 12:00:00 AM
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
Bridge rehabilitation including epoxy overlay, barrier repairs, steel tube railing repairs, expansion joint replacement, structural steel truss repairs, partial paint of structural steel, substructure repairs and approach reconstruction on US-23 over Ocqueoc River, Presque Isle County. This project includes a 5 year epoxy overlay performance warranty. Required DBE Participation: 0.00% Required SBP Participation: 3.00% Net Classification Required For This Project: ** 1062 Fa ** Completion Date: 9/3/2027 12:00:00 AM
Bridge rehabilitation including epoxy overlay, deck patching, superstructure and substructure patching, replacement of expansion joints, drain castings and retaining wall, concrete surface coating, guardrail and approach work on US-31 over Bear Creek in the city of Petoskey, Emmet County. This project includes a 2 year concrete surface coating warranty and a 5 year epoxy overlay warranty. Required DBE Participation: 0.00% Required SBP Participation: 3.00% Net Classification Required For This Project: ** 3532 N9-1A ** Completion Date: 8/20/2027 12:00:00 AM
The Michigan Department of Transportation seeks bids to rehabilitate the US-41 bridge over the Sturgeon River and the M-28 bridge over the Ontonagon River in Baraga and Ontonagon Counties. Work includes removing and replacing epoxy overlay, deck and substructure patching, expansion-joint and railing repairs, superstructure repairs, full painting, and associated approach work. The contract requires a five-year performance warranty on the epoxy overlay and a two-year warranty on bridge coating.