34043-208924 - Bridge rehabilitation including shallow overlay, full depth deck patching, superstructure repairs, substructure patching, barrier replacement, joint waterproofing and approach work on I-96 under Morrison Lake Road, Ionia County.
Description: Bridge rehabilitation including shallow overlay, full depth deck patching, superstructure repairs, substructure patching, barrier replacement, joint waterproofing and approach work on I-96 under Morrison Lake Road, Ionia County. The project includes a 2 year warranty on concrete surface coating. Required DBE Participation: 0.00% Required SBP Participation: 0.00% Net Classification Required For This Project: ** 2657 N9-1A ** Completion Date: 8/31/2027 12:00:00 AM
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
Bridge rehabilitation on two structures including removal of existing epoxy overlay, epoxy overlay, deck patching, expansion joint replacement, thrie beam retrofit, concrete rail post and rail balustrade patching, r4 railing post replacement, superstructure repairs, full paint, substructure patching and approach work.
Bridge rehabilitation including epoxy overlay, deck patching, superstructure and substructure patching, replacement of expansion joints, drain castings and retaining wall, concrete surface coating, guardrail and approach work on US-31 over Bear Creek in the city of Petoskey, Emmet County. This project includes a 2 year concrete surface coating warranty and a 5 year epoxy overlay warranty. Required DBE Participation: 0.00% Required SBP Participation: 3.00% Net Classification Required For This Project: ** 3532 N9-1A ** Completion Date: 8/20/2027 12:00:00 AM
The Michigan Department of Transportation seeks bids to rehabilitate the US-41 bridge over the Sturgeon River and the M-28 bridge over the Ontonagon River in Baraga and Ontonagon Counties. Work includes removing and replacing epoxy overlay, deck and substructure patching, expansion-joint and railing repairs, superstructure repairs, full painting, and associated approach work. The contract requires a five-year performance warranty on the epoxy overlay and a two-year warranty on bridge coating.
Key Contacts on this RFP
Decision makers connected to this RFP from Michigan Department of Transportation.
JRJean RuestmanAdministrator, Office of Passenger Transportation
*******@************
+1 (***) ***-****
CFCaitlyn FrenchBay Region Communications Representative