Summary
Work consists of 400 west maintenance and partial reconstruction, includes 39 SF of remove concrete sidewalk; reconstruct manhole; reconstruct valve box; 103 CY of asphalt pavement soft spot repair - contingency item; 2,952 TON of HMA - 1/2"; 19 TON of emulsified asphalt (tack); 582 SF of detectable warning surface; 4,981 SF of reconstruct pedestrian access ramp remove sidewalk; 4,991 SF of reconstruct pedestrian access ramp remove asphalt; 5,300 SF of reconstruct pedestrian access ramp sidewalk; 24,689 SY of rotomilling - 2"; 1,425 ft of pavement marking paint (stop line, crosswalk-12"); 144 ft of sign type a-1; 150 gal of pavement marking paint; Rectangular Rapid Flashing Beacon (RRFB) Assembly.