Summary
Street reconstruction work includes full reconstruction of street - approx. 500 LF. Work generally includes removals, earthwork, storm sewer improvements, sanitary sewer improvements, water line improvements, asphalt paving, aggregate base, stabilized subgrade, concrete curb and gutter, concrete commercial drives, traffic striping, pavement markings, and related appurtenances.
Major items (not all items) include approx. Removals & Earthwork: 2,218 SY removal of existing asphalt, 6"; 52 LF remove existing curb & gutter; 1,627 CY unclassified excavation; Storm Sewer: 463 LF storm sewer pipe, including 18" RCP, 30" RCP, and 26" x 43" RC arch pipe; 1 EA 5 ft x 5 ft RC box culvert;
5 EA storm manholes and 3 EA curb inlets. Sanitary Sewer: 523 LF PVC SDR-35 sanitary sewer pipe. 4 EA sanitary manholes. Water: 677 LF C-900 PVC water line Paving: 44 TON 2" Superpave Type S4 asphalt; 488 TON 4" Superpave Type S3 asphalt; 619 CY Type A aggregate base; 2,727 SY stabilized subgrade; 282 SY 8" P.C. concrete commercial drive; 670 LF concrete curb & gutter; Striping & Markings:; 3,188 LF thermoplastic striping.