Procurement and Installation of an Airfield Lighting Control and Monitoring Systems ACE-3 Upgrade *SOLE SOURCE*
The Contractor is responsible for the following services as required for the project described herein: Provide manpower and airport escorts as needed through entire installation, commissioning and testing effort. Coordinate and conduct all on-site training activities including ATC training, maintenance training and operations training. Make all necessary terminations for all ACE™ units. Terminations include landing, labeling and dressing all wire connections within the ACE™ unit, inside the Constant Current Regulator (CCR) and any other equipment being controlled or monitored by the control system, including but not limited to, Beacons, Generators, Auto-Transfer Switches, Approach systems and RVR equipment. See attached file.