Air Force Special Operations Command
FederalFL
Posted
Sep 15, 2026
Sep 25, 2026
30T Crane Repair - (Request for Quotation)
Task 1: Boom Cylinder Removal, Logistics, and Reinstallation: Removal: The Contractor shall safely disconnect, secure, and pull the main boom lift cylinder from the Grove RT530-E crane body at the vendor job site. Logistics & Transport: The Contractor shall transport the removed main boom lift cylinder to a specialized hydraulic facility (Tampa Hydraulic Shop or equivalent certified facility) for overhaul. Reinstallation: Upon completion of off-site overhauls, the Contractor shall transport the cylinder back to the Tallahassee/Hurlburt Field facility, safely align, and reinstall the overhauled cylinder into the crane chassis. See attached file.