Greene Street Improvement Project RFP
Street improvement.
Description: Harford Community College is soliciting bids for the 27B-001 Quad Area Paver Improvement Project at its Maryland campus. The work involves paver installation with associated electrical, plumbing, and data connections. A pre-bid meeting and site visit are scheduled for September 10, 2026, at 10:00 AM, and responses are due October 6, 2026.
HigherEducation · MD, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
Posted
Sep 18, 2026
Oct 21, 2026
Street improvement.
Douglasville-Douglas County Water And Sewer Authority
Special DistrictGA
Posted
Sep 9, 2026
Oct 7, 2026
The work to be performed shall include the removal of approximately 45 LF of 18-inch corrugated metal pipe (CMP), 148 LF of 42" CMP, 528 LF of 48" CMP, five (5) double wing catch basins, four (4) junction boxes, two (2) headwalls and one (1) raised pedestal inlet. The Project includes installation of 59 LF of 36" reinforced concrete pipe (RCP), 96 LF of 42-inch RCP, 46 LF of 48" RCP, 481 LF of 54" RCP, four (4) double wing catch basins, four (4) junction boxes, two (2) raised pedestal inlets, two (2) concrete headwalls and associated road restoration.
CityIL
Posted
Sep 10, 2026
Oct 1, 2026
Work includes 404 Gal bituminious materials (prime coat), 4,035 SY bituminious surface removal, 2", 4,035 SY bituminious concrete surface course, 2" n50, 300 SY pavement removal (full depth), 300 SY concrete pavement, 8", 100 SY misc. Surface patching, 2", 1 EA remove and replace inlet, type c, 8 EA existing inlet patching, 4 EA adjust structure frame, 500 LF pavement markings, paint, 4" yellow, and traffic control.
CityVT
Posted
Sep 9, 2026
Oct 5, 2026
The City of Vergennes is soliciting statements of qualifications from firms or individuals to provide financial project management, funding administration, and compliance support for its wastewater system improvement project. The work covers budget and cash-flow oversight, USDA Rural Development and Vermont CWSRF reimbursement and disbursement administration, procurement and contract support, labor-standards coordination, reporting, audit support, and closeout. It is a municipal services RFQ—not a grant program—with responses due by 5:00 PM on October 5, 2026, and construction anticipated from September 2026 through 2028.
Decision makers connected to this RFP from Harford Community College.