Alabama Department of Transportation
Special DistrictAL
Posted
Aug 29, 2026
Sep 25, 2026
Planing, Resurfacing, and Traffic Stripe on SR-1 (US-431) RFP
Work includes 289 SY removing concrete sidewalk, 1,962 LF removing curb, 44 LF removing curb and gutter, 115 LF removing railroad tracks, 2 EA removing manholes, 2,292 CY unclassified excavation, 70 CY borrow excavation (loose truckbed measurement) (a4 or better), 8 rbst roadbed processing, 6,979 SY crushed aggregate base course, type b, road mixed, 6" compacted thickness, 20 Ton crushed aggregate, section 825, type b, for miscellaneous use, 6,979 SY bituminous treatment a, 3,409 Gal tack coat, 12,845 SY planing existing pavement (approx 1.10" thru 2.0" thick). See attached file.