CityIL
Posted
Aug 31, 2026
Oct 19, 2026
Lead Service Line Replacement Phase 11C
Work includes 33 LF public water service, bored or pulled, copper, complete, 1"; 33 LF private water service, bored or pulled, copper, complete, 1"; 25 LF additional set-up boring length; 45 SF sidewalk removal & replacement; 15 SY pavement removal & patch replacement, class d; 10 LF combination curb and gutter removal and replacement; 1 EA connection to water meter (basement/ crawlspace), complete; 1 LS restoration, complete; 1 EA primary electrical grounding system installation; 1 EA reconnection of water service electrical jumper cable; 110 SY pcc pavement, jointed, removal and replacement, 9"; 55 SY pcc approach pavement removal and replacement, 6". See attached file.