Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Stafford County is soliciting bids for Phase II upgrades to the Smith Lake Water Treatment Facility, a construction project. Bidders must visit the buyer's procurement portal (Link to Bid Source) for full solicitation documents and submission instructions.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Invitation for Bids for Phase II upgrades to the Smith Lake Water Treatment Facility in Stafford County, VA, including replacement of meters, pumps, tanks, chemical feed systems, and related demolition and coatings to improve operational efficiency and safety. The work will be performed at the Smith Lake WTF in Stafford County and includes scheduling constraints for major tie-ins (Nov 1–Mar 31) to minimize service disruption.
Posted Date
Nov 24, 2025
Due Date
Jan 14, 2026
Release: Nov 24, 2025
Close: Jan 14, 2026
Invitation for Bids for Phase II upgrades to the Smith Lake Water Treatment Facility in Stafford County, VA, including replacement of meters, pumps, tanks, chemical feed systems, and related demolition and coatings to improve operational efficiency and safety. The work will be performed at the Smith Lake WTF in Stafford County and includes scheduling constraints for major tie-ins (Nov 1–Mar 31) to minimize service disruption.
Premium
Access the largest public sector contact database
This solicitation is to establish a contract for TECHNOLOGY UPGRADES PHASE II 2026.
Posted Date
Dec 2, 2025
Due Date
Dec 13, 2025
Release: Dec 2, 2025
Close: Dec 13, 2025
This solicitation is to establish a contract for TECHNOLOGY UPGRADES PHASE II 2026.
AvailableWork includes : replace the existing raw water magnetic flow meter installed in the existing raw water valve vault v-1; replace the five existing superpulsator clarifier vacuum pumps and associated piping and valves installed on the top of the two vacuum chambers serving clarifiers 1 through 4; demolish the existing outdoor fluoride storage tank and miscellaneous pads within the existing combined fluoride and caustic soda containment structure. Also demolish the indoor fluoride transfer pumps, day tank, scale, metering pumps and associated piping; see attached file.
Posted Date
Nov 7, 2025
Due Date
Jan 14, 2026
Release: Nov 7, 2025
Close: Jan 14, 2026
Work includes : replace the existing raw water magnetic flow meter installed in the existing raw water valve vault v-1; replace the five existing superpulsator clarifier vacuum pumps and associated piping and valves installed on the top of the two vacuum chambers serving clarifiers 1 through 4; demolish the existing outdoor fluoride storage tank and miscellaneous pads within the existing combined fluoride and caustic soda containment structure. Also demolish the indoor fluoride transfer pumps, day tank, scale, metering pumps and associated piping; see attached file.
AvailableConstruction of Shelby Hall Pumping and Piping Upgrades - Phase II.
Posted Date
Nov 17, 2025
Due Date
Jan 20, 2026
Release: Nov 17, 2025
Close: Jan 20, 2026
Construction of Shelby Hall Pumping and Piping Upgrades - Phase II.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis