StateON
Posted
Nov 16, 2026
Dec 2, 2026
Description: Replacement of asphalt base failures, asphalt overlay, demolition and replacement of existing concrete structures, drainage/stormwater piping, replacement of curb and gutter, and general roadway construction.
City · MS, US
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from City of Richland.
Adjacent opportunities open for bidding right now.
StateON
Posted
Nov 16, 2026
Dec 2, 2026
Infrastructure Ontario is seeking architectural services for leasehold improvements at 20 Richmond St. E. and 1 Queen St. E. in Toronto. The work includes pre-design, design, tendering, contract administration, and close-out for the project lifecycle, renovating approximately 6,600 sq. ft. at 1 Queen St. E. and 127,500 sq. ft. at 20 Richmond St. E. as government office space. The project has two stages: functional programming, followed by design and construction implementation.
CountyGA
Posted
Oct 28, 2026
Nov 25, 2026
Removal of existing storm drain pipe and installation of new storm drain pipe in three locations.
Rocklin Unified School District
School DistrictCA
Posted
Sep 17, 2026
Dec 10, 2026
RFP 26-110 seeks CAT6A horizontal copper cabling installation, including materials, labor, equipment, labeling, testing, certification, and removal of existing wiring in work areas at Rocklin Elementary School and Rocklin High School. Responders must determine their own cable quantities and lengths, reuse existing raceways, racks, and cabinets, and attend a mandatory project walk. The contract term is April 1, 2027 through September 30, 2028, and proposals are due December 9, 2026 before 4:00 p.m.
CityMI
Posted
-
Dec 1, 2026
The City of Grand Rapids is soliciting construction improvements at Richmond Park Playground, including accessible and ground-level play, sensory features, trees, and other plantings. Work includes removing existing equipment and site features, regrading and installing pavement and drainage improvements, constructing a seat wall and stairs, and installing playground equipment, safety surfacing, furnishings, and landscaping. Construction is scheduled for 2027, with substantial completion due August 1, 2027 and final completion due September 15, 2027.