Mississippi Department of Transportation
State AgencyMS
Posted
Oct 30, 2026
Nov 24, 2026
I-55 over CNIC RR (Bridge 40.3 A & 40.3 B) - Bridge Repair RFP
Work includes 800 SY removal of asphalt pavement, all depths, including soil cement base, 118 SY removal of concrete paved ditch, 200 LF removal of fence, all types, 820 LF removal of guard rail, including rails, posts and terminal ends, 3,400 LF removal of traffic stripe, 325 SY geotextile stabilization, type v, non-woven, 54 SY solid sodding, 1 thousand gal watering, 10 CY concrete paved ditch, 1 Ton agricultural limestone, 2 Ton mulch, vegetative mulch, 88 Ton granular material, crushed stone, 1,100 LF cleaning and filling joints in pcc pavement, 810 LF saw cut, full depth, 810 LF guard rail, class A, Type 1. See attached file.
