Project is for a traditional breakpoint nutrient reduction wetland. In general, the work involves, selective clearing, excavation, grading, steel sheetpile installation, tile installation, water control structure, riprap, concrete grout and seeding. This project includes about 15,204 CY of earthwork, installation of 2,523 SF of steel sheetpile, water control structure, 540 LF of HDPE tile installation, 957 LF of reinforced concrete pipe (RCP), 303 Tons of riprap, 46 CY of concrete grout and 15.2 AC of seeding. See attached files.