Description: Work consists of 330 lf of 36" steel casing pipe, 340 lf of pvc water main, 62 lf of pvc water main, 2 ea of pvc water main, 5 ea of pvc water main, 1 ea of connection to existing water main, 1 ea of gate valve.
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
From the first pre-RFP signals to the published RFP and its files.
Capital improvement plan
The proposed CIP included a new water storage tank and a 16-inch transmission main under Interstate 70 through a bored casing, with $2,000,000 scheduled in 2025.
See sourceHide source
NEW WATER STORAGE TANK WITH WATER MAIN IMPROVEMENTS Fund: Water Department: Water Location: Interstate Drive/Wilmer Rd. Project Cost: $9,860,000 I Outside Funding: $860,000 I City Cost: $9,000,000 Design - $860,000 Construction - $9,000,000 Federal American Rescue Plan Act - $860,000 Bond Issue - $7,000,000 Description and Justification: The construction of…
City of Wentzville Capital Improvement Plan 2025-2029
The City reported that the Schroeder Creek Boulevard I-70 water casing and coordinating waterline extension had been designed, with bidding anticipated in 2026.
See 2 sourcesHide sources
WATER/WASTEWATER UTILITY INITIATIVES The Utilities Department continues to experience increasing demand on both our water and wastewater systems and is undertaking several capital projects to support this increased demand. A water casing under I-70 at Schroeder Creek Blvd has been designed and is planned for construction to coincide with the Improve I-70…
City of Wentzville, Missouri Annual Comprehensive Financial Report FY2025
The tentative agenda proposed authorization to acquire permanent and temporary easements for the Schroeder Creek/Wilmer Road water transmission main project.
See sourceHide source
CITY OF WENTZVILLE TENTATIVE AGENDA Wednesday, Jun. 24, 2026 BOARD OF ALDERMEN Page 4 X. NEW BUSINESS 1. (ID # 14490) Welcome to Wentzville Magnet Purchase 2. (ID # 14485) Lowes Blue to Blue Grant Donation 3. (ID # 14463) Resolution No. 26-2396, a Resolution of the City of Wentzville, Missouri, Approving an Agreement with Sweetens Sealing Services for the…
City Of Wentzville Board Of Aldermen Tentative Agenda
Meeting agenda · Jun 24, 2026
Capital improvement plan
56 days before RFP
The draft CIP proposed citywide waterline extensions and replacements totaling $20,870,000, including recommended masterplan casings and extensions, with funding scheduled for 2027–2030.
See sourceHide source
WATERLINE EXTENSIONS AND REPLACEMENTS Fund: Water Department: Water Location: City Wide Project Cost: $20,870,000 I Outside Funding: $-0- I City Cost: $20,870,000 Bond Issue - $20,000,000 PROJECT DESCRIPTION YEAR LOCATION SIZE (IN) LENTH (FT) COST ($) 2027 Interstate Dr./Prospect Rd. Water Transmission Main - Bond Issue 16/18 11,000 10,700,000 2027/2028 Hwy…
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
A water casing under I-70 at Schroeder Creek Blvd has been designed and is planned for construction to coincide with the Improve I-70 MoDOT project, with an anticipated bid date in 2026. A coordinating waterline extension has been designed along Schroeder Creek Blvd., with Phase 1 beginning construction in the fall of 2025 and Phase 2 anticipated to begin…
City Of Wentzville Audit Committee Tentative Agenda
Procurement of services for improvements to existing sanitary sewer infrastructure, including replacing and improving a section of existing sewer crossing, providing a new protective casing and structural support system, and connecting improvements to the existing sanitary sewer system at Lakes at Saddle Creek.
Work includes 5,130 SY clearing and grubbing, wooded areas; 5,130 SY seeding and fine grading; 30 ea select tree removal in maintained residential/commercial yards and city row (over 15" in dia); 20 LF sanitary sewer open cut - 6" pvc; 4 LF sanitary sewer open cut - 10" pvc; 300 LF sanitary sewer open cut - 24" pvc; 12 VF manholes - standard - 72" dia - (cso regulator); 16 VF doghouse manholes - 60" dia; 1 LS 24" diameter dip sewer trenchless crossing - (sheet c-002); 1 EA machine core existing manhole; 8 EA manhole frames and covers - standard; 3 EA manhole frames and covers - waterproof. See attached file.