CountyMO
Posted
Sep 4, 2026
Sep 17, 2026
Klondike Park Waterline Replacement *Re-Bid*
Work inlcudes remove and replace all water lines, all new water lines are to be placed in the same trench as the existing except where designated, all water lines are to be excavated & trenched not bored, reinstalling the new pipe as the old pipe is being removed to minimize total open trench area, all pipe sizes will need to be replaced with the same size as the existing, all main water lines need to be 3" sdr 21 all laterals will be the same material just different sizes where needed, all new pipes must lay on top of 6" of compacted 1" minus and have 6" of compacted 1" minus on top of it. See attached file.