Retrieving RFP details
Release
Close
North Charleston Sewer District
Work includes to perform a preliminary engineering report for the wwtp main influent pump station.
Felix-C
-Davis-WWTP-–-Main-Influent-Pump-Station-PER-Final
Borough of Hightstown
Rehabilitation of the influent pump station dry well, valve and pipe replacement, floor repairs and replacement, welding, cleaning, painting, restoration and other incidentals.
City of Imperial
Final design shall include, but is not limited to: connection to the existing influent sewer collection system and diversion to the new headworks screens and influent pump station; new headworks screening and influent pump station structure and equipment; new odor control and foul air scrubber system; connection to existing fine screens; piping required to complete the project; site civil, grading, paving, drainage, & demolition required to complete the project; electrical, instrumentation, and scada equipment. Develop, maintain, and monitor the overall project scope, budget, and schedule. See outside link.
Township of South Hanover
Construction of a new pump station with a wet well and control building a new force main from the new pump station to an existing manhole lining of connecting manholes and site work.
Release
Oct 30, 2025
Close
Dec 04, 2025