Winslow Township School District
School DistrictNJ
Posted
Oct 15, 2025
Nov 24, 2026
High School Pole Barn *REBID* RFP
High school pole barn.
Description: Construction of a 25' x 65' wood, gable truss roof pole barn to be erected on formed and poured concrete piers. Building Specifications: Footprint: 25' wide x 65' long (1,625 square feet), Structure: wood, Roof: gable truss, Front (High) Eave Height: 18'-0” (18'-1” at eave point), Rear (Low) Eave Height: 16'-0”, Columns: 8 total – 4 per long side, Bay Spacing: 3 bays at approximately 21'-8”, Foundation: 8 formed and poured concrete piers, Floor: None – existing grade.
City · TN, US
Adjacent opportunities open for bidding right now.
Winslow Township School District
School DistrictNJ
Posted
Oct 15, 2025
Nov 24, 2026
High school pole barn.
CountyTN
Posted
Nov 12, 2026
Dec 3, 2026
Pole barn construction.
CountyFL
Posted
Oct 23, 2026
Nov 23, 2026
This project includes the purchase, delivery and construction of a wood pole barn with concrete slab at the White City Boat Ramp. Building will be 30 FT by 50 FT with an eave height of 10 FT. Building will have roof only with no walls, must have a wind load rating of 150 mph, and must meet latest Building Code.
CountyFL
Posted
Oct 23, 2026
Nov 23, 2026
This project includes the purchase, delivery and construction of a wood pole barn with concrete slab at the Howard Creek Lower Landing Boat Ramp. Building will be 20 FT by 30 FT with an eave height of 10 FT. Building will have roof only with no walls, must have a wind load rating of 150 mph, and must meet latest Florida Building Code.
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File Retrieval