CityTX
Aug 20, 2026
Closes
Sep 17, 2026
23rd Street Lift Station Force Main Rehabilitation and Supplemental Improvements
Construction of 23rd street lift station force main rehabilitation and supplemental improvements includes install temporary erosion, sedimentation, and environmental controls, complete in place; 60 LF of trench excavation protection (all depths), including a pe stamped trench safety plan; barricades, signs, and traffic handling; groundwater control for all open cut excavation operations, complete in place; 75 lf of remove and dispose of existing concrete curb, as shown on the plans; remove and dispose of remaining driveway section, as called out on the plan set; full depth 6 inch concrete driveway construction with 6" of compacted subgrade, to match existing driveway profile and limits; 80 LF of replacement of concrete curb to match existing type, dimensions, and profile, complete in place; remove and replace existing 8 security fence and posts per plans and details. See outside link.