Aug 7, 2026
Closes
Aug 21, 2026
6910--Vehicle Transfer Simulator Salt Lake City, UT - Request for Quote (RFQ
1 EA - Vehicle Transfer Simulator, Height Adjustment System.
Description: The Department of Veterans Affairs, through Network Contract Office 19, seeks quotes from small businesses for one wheelchair-accessible minivan with rehabilitation and adaptive-driving modifications for delivery and installation at the George E. Wahlen VA Medical Center in Salt Lake City, Utah. The requirement includes the vehicle, a modification/conversion system, installation and delivery labor, with technical documentation, pricing, lead time, Buy American certification, and an authorized-distributor letter required as applicable. This combined synopsis/solicitation anticipates a firm-fixed-price, all-or-nothing award, and emailed quotes are due to Stephanie Cahill by 12:00 p.m. MDT on August 27, 2026.
Federal · CO, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Procurement and program contacts connected to Network Contract Office 19 (36C259).
Adjacent opportunities open for bidding right now.
Aug 7, 2026
Closes
Aug 21, 2026
1 EA - Vehicle Transfer Simulator, Height Adjustment System.
CityAL
Aug 9, 2026
Closes
Sep 3, 2026
To construct improvements and safety modifications to auburn city hall including renovations to the customer service desk and the reception desk areas, minor reconfigurations to existing office area, improved hvac controls throughout the building, and other miscellaneous improvements. Additive alternates to the project include all labor, materials, and equipment necessary to replace the flooring in the first-floor west wing of the building (ocm wing) and ada parking lot improvements on the west side of the building.
CityUT
Aug 3, 2026
Closes
Aug 27, 2026
Salt Lake City Corporation issued this open Request for Information to gather information about codification-services solutions before deciding whether to issue a future invitation for bids or request for proposals. The requested solution should support converting adopted ordinances into an updatable, searchable, user-friendly platform, archiving outdated code and policy, ADA compliance, and secure user management. This RFI is for information gathering only and is not a procurement process or a grant program; responses are due August 27, 2026, at 2:00 p.m. MDT.
Jun 3, 2026
Closes
Aug 31, 2026
Work shall include construction of a reinforced concrete auxiliary spillway with two, 8 feet by 16 feet, precast concrete culverts through the dam crest to serve as the spillway inlet with a reinforced concrete stepped chute along the downstream slope that discharges into a reinforced concrete stilling basin at the toe of the dam. A reinforced concrete floodwall with concrete cutoff shall be constructed along the upstream crest of the dam along KY-555 with rockfill placed along the upstream slope of the dam. A rockfill stability berm shall be constructed along the downstream slope. Work further includes a new low-level drawdown valve in the dry well of the riser structure, replacement of the existing low level drawdown valve, and remediation of concrete cracking and seepage in the existing principal spillway culvert. In addition, the City of Springfield’s raw water intake will be abandoned and new raw water intake lines installed within the principal spillway culvert. A Contractor designed Water Diversion Plan is required. The BASE BID Work will also consist of site preparation, erosion and sedimentation control, slope construction and protection, construction access, selective demolition, earthwork, temporary shoring, traffic control and maintenance, storm drainage, and site grading and restoration work. Demolition Work shall include demolition of existing storm sewer infrastructure, raw water lines, concrete ditches, KY 555 within the footprint of the new auxiliary spillway, existing valves and operators at the intake structure, partial demolition of the principal spillway culvert and wingwalls, and abandonment of existing embankment piezometers. The CONTRACTOR’s Work shall also include site safety, water control, site security, traffic control, and site cleanup.