CityNY
Posted
Aug 21, 2026
Sep 11, 2026
2026-2027 Highway Improvements
Work include 27,500 TN tons, asphaltic concrete for wearing course (6f or 12.5mm 40%rap mix); 250,000 SY cold milling as specified; 6,000 LF, cutting key in existing asphaltic concrete pavement, to allow transition from new work to existing work (minimum of 3' width); 1,000 LF, full-depth saw-cutting of existing asphalt pavement; 1,000 SY milling for correcting drainage flow "spot milling"; 5,000 SY old bituminous pavement wearing course removed; 10 EA manhole head; 600 EA manhole heads removed and replaced; 5 EA water main gate valve skirts adjusted; 160 LF 12" ductile iron pipe.