Minneapolis-St Paul Metropolitan Airports Commission
Special DistrictMN
Posted
-
Dec 15, 2026
2027 MSP Campus Building Roof Replacements RFP
This work includes removal and replacement of existing roofing systems at various locations including the Hub Core building at Terminal 1, an adjacent electrical substation, another adjacent stair tower, the Sun Country Headquarters, the DHL/Air General building and an electrical substation under the Concourse C tram system. The work will also include the installation of sheet metal flashing, installation of anchors for fall protection including structural steel modifications, metal fabrication, and sealant install. Mechanical and electrical systems will be reconfigured to facilitate this scope of work and will include roof drains and piping, equipment removal and reinstall, and lightning protection.