School DistrictMN
Aug 18, 2026
Closes
Sep 24, 2026
2027 Building Envelope Improvements RFP
Building envelope improvements.
Description: Building Envelope Improvement Project.
SchoolDistrict · MN, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
School DistrictMN
Aug 18, 2026
Closes
Sep 24, 2026
Building envelope improvements.
South Carolina Department of Transportation
State AgencySC
Aug 3, 2026
Closes
Sep 9, 2026
Work includes 3 EA construction stakes, lines & grades; 1 LS railroad insurance and flagging ns; 400 LF removal of exist. Guardrail; 913. 440 STA excavation for shoulder paving; 913. 440 STA hauling of excavated shoulder material; 4,255 TON additional rock for full depth reclamation; 121,130 SY cement modified recycled base (10" unif)-curing method b; 4,240 TON portland cement for cement modified recycled base course; 7,998.760 TON hma shoulder widening course. See attached file.
South Carolina Department of Transportation
State AgencySC
Aug 7, 2026
Closes
Sep 9, 2026
Work includes approx. 1 LS mobilization, 2,447 CY unclassified excavation, 120 SY 8" pavement patching, 37,600 SY milling existing asphalt pavement, 1,556 SF permanent construction sign, 914 EA permanent yellow pavement makers, 21.030 MI milled-in rumble strip, 1 EA adjust catch basin, 400 SY 6" concrete sidewalk, 700 SY pedestrian ramp, 4.010 AC permanent grassing.
CityCA
Aug 11, 2026
Closes
Sep 1, 2026
Project includes digout, crack seal and slurry on approximately 13 street segments.
Decision makers connected to this RFP from Medford Public School District.