CityLA
Posted
Jul 8, 2026
Oct 7, 2026
2026 - 2027 Water Tower Improvements
The work shall consist of installation of one (1) 1,400 gpm service pump to supplement two existing service pumps, installation of three (3) variable frequency drives, related modifications/updates to the existing SCADA system, installation of a pump control panel, miscellaneous repairs to the elevated water tower, removal of both the exterior and interior coating systems of the elevated water tower, exterior lead abatement and containment during coating removal operations, and coating of both the exterior and interior of the elevated water tower.
