School DistrictOH
Jul 2, 2026
Closes
Aug 20, 2026
2027 Roof Replacement At Coffman High School
High school roof replacement project includes prepare the existing steel roof decking by removing corrosion and paint the existing roof decking; remove and replacement of areas of deteriorated steel roof decking; remove roof system anomalies down to the concrete roof deck, install new roof insulation and repair the existing modified bitumen roof system with 2 plies of sbs modified bitumen roof membrane adhered in cold-adhesive; roofing foreman; roofing mechanic