Wisconsin Department of Transportation
State AgencyWI
Posted
Sep 8, 2026
Oct 13, 2026
Description: Removals, milling, grading, aggregate, concrete pavement, asphalt pavement, structure replacement, structure rehabilitation, culvert pipe, curb and gutter, concrete sidewalk, beam guard, erosion control, permanent signing, traffic control, pavement marking. See attached files and outside link.
StateAgency · WI, US
Original attachments and procurement documents tied to this bid.
Decision makers connected to this RFP from Wisconsin Department of Transportation.
Adjacent opportunities open for bidding right now.
Wisconsin Department of Transportation
State AgencyWI
Posted
Sep 8, 2026
Oct 13, 2026
Removals, grading, aggregate, asphalt pavement, structure replacement, culvert pipe, beam guard, erosion control, permanent signing, traffic control, restoration. See attached files and outside link.
Wisconsin Department of Transportation
State AgencyWI
Posted
Aug 11, 2026
Sep 15, 2026
Work includes : 9,100 CY excavation common; 120 CY select crushed material; 65 SY concrete pavement 12"; 100 SY concrete pavement approach slab; 520 LF asphaltic rumble strips, centerline; 1,305 SY protective surface treatment; 110 LF culvert pipe class III-a non-metal 30"; see attached file.
Wisconsin Department of Transportation
State AgencyWI
Posted
Aug 11, 2026
Sep 15, 2026
Work includes : 403,060 SY removing asphaltic surface milling; 5,910 CY excavation common; 198 SY concrete pavement replacement; 21,950 TON hma pavement 4 mt 58-28 s; 173,460 LF asphaltic rumble strips, shoulder divided roadway; 13 LF culvert pipe corrugated steel 30"; see attached file.
Wisconsin Department of Transportation
State AgencyWI
Posted
Aug 11, 2026
Sep 15, 2026
Work includes : 400 CY excavation common; 215 SY concrete pavement approach slab; 1,125 SY protective surface treatment; 162 SY pigmented surface sealer reseal; 12 SY full-depth deck repair; 100 LF concrete curb & gutter 18" type a; see attached file.