Wisconsin Department of Transportation
State AgencyWI
Posted
Aug 11, 2026
Sep 15, 2026
Description: Removals, milling, grading, aggregate, asphalt pavement, beam guard, erosion control, traffic control, pavement marking, restoration. See attached files and outside link.
StateAgency · WI, US
Original attachments and procurement documents tied to this bid.
Decision makers connected to this RFP from Wisconsin Department of Transportation.
Adjacent opportunities open for bidding right now.
Wisconsin Department of Transportation
State AgencyWI
Posted
Aug 11, 2026
Sep 15, 2026
Work includes : 24,612 CY excavation common; 33 EA temporary lane shift during culvert work; 100 TON asphaltic surface patching; 23,260 LF asphaltic rumble strips, shoulder; 47,245 LF asphaltic rumble strips, centerline; 1,134 LF culvert pipe reinforced concrete class iv 24"; see attached file.
Wisconsin Department of Transportation
State AgencyWI
Posted
Aug 11, 2026
Sep 15, 2026
Work includes : 350 CY excavation common; 14,900 TON base aggregate dense 3/4"; 5,500 TON hma cold weather paving; 42,600 LF asphaltic rumble strips, centerline; 6,520 SY resin binder high friction surface treatment; 14 CY riprap medium; see attached file.
Wisconsin Department of Transportation
State AgencyWI
Posted
Sep 8, 2026
Oct 13, 2026
Removals, grading, aggregate, structure replacement, erosion control, permanent signing, traffic control, restoration. See attached files and outside link.
Wisconsin Department of Transportation
State AgencyWI
Posted
Sep 8, 2026
Oct 13, 2026
Removals, grading, aggregate, concrete pavement, asphalt pavement, structure replacement, culvert pipe, curb and gutter, concrete sidewalk, storm sewer, beam guard, erosion control, permanent signing, traffic control, pavement marking, sanitary, restoration. See attached files and outside link.