Description: The City of Belleville will be accepting sealed bids for 2026 Trail Sealing Project for Richland Creek Greenway Trail, Signal Hill Trail, West Belleville Trail, Bellevue Park Walking Trail, and South Side Park Loop.Belleville, IL. Proposed Imporvement: crack seal, apply pavement sealer, and replace pavement markings.
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
From the first pre-RFP signals to the published RFP and its files.
1 file available
Board meeting
602 days before RFP
The Finance Committee reviewed a proposed FY2025-2026 budget covering citywide MFT maintenance, the West Belleville Bike Trail, and increased pavement-marking funding.
See sourceHide source
FY2025-2026 Budget Review & Discussion Jamie Maitret gave an overview of the budget process and then started to go through the budget explanations. Jamie stated that the total proposed budget for all funds for the fiscal year 25/26 is $145,925,073. This is an increase of approximately 5.7% as compared to the current fiscal year original budget of…
Public Works Director Jason Poole reported that money was budgeted to reseal all trails and that a bid packet would be prepared.
See sourceHide source
Director of Public Works Mr. Poole informed the board members that the contractor Hank's Excavating for the Pleasant Hill project is very close to putting asphalt down for the trail extension, road extension and the pickleball courts. Mr. Poole stated part of the same contract was removing a bridge, installing a culvert pipe, trail repair and resealing the…
Board of Trustees of the Belleville Parks and Recreation Department Regular Meeting
The City of Belleville will be accepting sealed bids for 2026 Trail Sealing Project for Richland Creek Greenway Trail, Signal Hill Trail, West Belleville Trail, Bellevue Park Walking Trail, and South Side Park Loop.Belleville, IL. Proposed Imporvement: crack seal, apply pavement sealer, and replace pavement markings.
The Marin County Open Space District is soliciting bids to install a recreational trail bridge at Cascade Canyon Open Space Preserve in Fairfax, California. The work includes a 90-foot-long, 6-foot-wide prefabricated weathered-steel truss bridge with a redwood deck above the 100-year flood elevation. Associated improvements include concrete spread footings, engineered approach fill, rock riprap repairs, and compacted road and trail surfaces meeting firm-and-stable standards.
The Marin County Open Space District is soliciting bids to install a recreational trail bridge at Cascade Canyon Open Space Preserve in Fairfax, California. The work includes a 90-foot-long, 6-foot-wide prefabricated weathered-steel truss bridge with a redwood deck above the 100-year flood elevation. Associated improvements include concrete spread footings, engineered approach fill, rock riprap repairs, and compacted road and trail surfaces meeting firm-and-stable standards.