Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Installation of approx. 800 LF of 6" ductile iron water main; reconnect existing fire hydrants; make connections to the existing water system; renew or reconnect existing water services; install three (3) type 1 catch basins; install approx. 326 LF of 12" corrugated polyethylene storm sewer pipe; connect to existing drainage structures; excavate and reconstruct approx. 330 CY of roadway; remove and replace approx. 237 LF of cement concrete traffic curb and gutter , place hot mix asphalt (HMA); and perform all other work required.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The work to be performed shall include but not be limited to: installation of all underground backbone utilities in support of the Cultural Terrace including installation of both wet utilities (water, stormwater, fire water, and irrigation), and dries (electrical, communications, EV and solar-ready conduits, and gas), from utility purveyor tie-in points along Marine Way and Skyhawk, and other items not mentioned here, but required within the Special Provisions.
Posted Date
Nov 26, 2025
Due Date
Jan 27, 2026
Release: Nov 26, 2025
Close: Jan 27, 2026
The work to be performed shall include but not be limited to: installation of all underground backbone utilities in support of the Cultural Terrace including installation of both wet utilities (water, stormwater, fire water, and irrigation), and dries (electrical, communications, EV and solar-ready conduits, and gas), from utility purveyor tie-in points along Marine Way and Skyhawk, and other items not mentioned here, but required within the Special Provisions.
AvailableThe City of Royal Oak, Michigan is soliciting sealed bids for the 2026 Catalpa Drive Resurfacing Improvements (Contract CAP2607), covering resurfacing and associated water-main and roadway work from Woodward Avenue to N. Main Street. The project includes asphalt milling and paving, concrete repairs, curb/driveway replacements, pedestrian refuge islands, water-main installation, lead service replacement, restoration, and striping. Bids are due by 12:00 pm ET on 2026-02-05 and must be submitted electronically through the City’s procurement portal.
Posted Date
Jan 15, 2026
Due Date
Feb 5, 2026
Release: Jan 15, 2026
Close: Feb 5, 2026
The City of Royal Oak, Michigan is soliciting sealed bids for the 2026 Catalpa Drive Resurfacing Improvements (Contract CAP2607), covering resurfacing and associated water-main and roadway work from Woodward Avenue to N. Main Street. The project includes asphalt milling and paving, concrete repairs, curb/driveway replacements, pedestrian refuge islands, water-main installation, lead service replacement, restoration, and striping. Bids are due by 12:00 pm ET on 2026-02-05 and must be submitted electronically through the City’s procurement portal.
The City of Burleson, Texas is soliciting sealed bids for the Elk Drive Sidewalk Improvements project (ST2503). The scope includes approximately 220 SY of 6‑inch concrete pavement for Elk Drive and driveways, 668 SY of 5‑foot concrete sidewalk with detectable warning surfaces, multiple flumes with steel plates, and Flexamat, with an anticipated duration of 60 calendar days. Bids open on January 17, 2026 and are due February 12, 2026 at 2:00 PM CST, with a virtual pre‑bid on January 28, 2026 and a virtual bid opening at 3:00 PM.
Posted Date
Jan 17, 2026
Due Date
Feb 12, 2026
Release: Jan 17, 2026
Close: Feb 12, 2026
The City of Burleson, Texas is soliciting sealed bids for the Elk Drive Sidewalk Improvements project (ST2503). The scope includes approximately 220 SY of 6‑inch concrete pavement for Elk Drive and driveways, 668 SY of 5‑foot concrete sidewalk with detectable warning surfaces, multiple flumes with steel plates, and Flexamat, with an anticipated duration of 60 calendar days. Bids open on January 17, 2026 and are due February 12, 2026 at 2:00 PM CST, with a virtual pre‑bid on January 28, 2026 and a virtual bid opening at 3:00 PM.
The project includes the construction of approx. 4,200 LF of watermain along with associated water services. The project includes placing approx. 200 LF of storm sewer, approx. 23,000 SF of new sidewalk along the west side of Maple Street, an underground storm water detention system, retaining walls, and miscellaneous sanitary improvements along Maple Street. The project includes reconstructing the west lane of Maple Street, crushing & shaping the east lane, and paving with approx. 4,800 Tons of HMA, along with all associated work. This project also includes steel sheet pile seawall repairs, concrete sidewalk replacement, earthwork, concrete patching, drainage improvements, asphalt resurfacing, turf restoration, traffic controls and related work at various other locations. Lastly, the project includes a mill and fill.
Posted Date
Dec 23, 2025
Due Date
Jan 27, 2026
Release: Dec 23, 2025
Close: Jan 27, 2026
The project includes the construction of approx. 4,200 LF of watermain along with associated water services. The project includes placing approx. 200 LF of storm sewer, approx. 23,000 SF of new sidewalk along the west side of Maple Street, an underground storm water detention system, retaining walls, and miscellaneous sanitary improvements along Maple Street. The project includes reconstructing the west lane of Maple Street, crushing & shaping the east lane, and paving with approx. 4,800 Tons of HMA, along with all associated work. This project also includes steel sheet pile seawall repairs, concrete sidewalk replacement, earthwork, concrete patching, drainage improvements, asphalt resurfacing, turf restoration, traffic controls and related work at various other locations. Lastly, the project includes a mill and fill.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis