CityAL
Posted
Sep 10, 2026
Oct 1, 2026
2026 Street Improvements Project RFP
The project consists of resurfacing various streets within the city limits.
Description: The project consists of furnishing, installing and providing all labor and materials required for approximately 130,000 square yards of hot-in-place asphalt recycling, edge milling, full depth HMAC repair, adjustment of water valves and manholes, tree pruning, traffic control, and miscellaneous striping.
FireDepartment · TX, US
Original attachments and procurement documents tied to this bid.
These related opportunities are still open for bidding.
CityAL
Posted
Sep 10, 2026
Oct 1, 2026
The project consists of resurfacing various streets within the city limits.
CityCA
Posted
-
Sep 21, 2026
Project consists of slurry seal, grinding of existing pavement, performing digout repairs, tree root removal, installing hot mix asphalt, adjusting manholes, valves, boxes, and monument covers, and installing pavement striping and markings.
CityFL
Posted
-
Sep 28, 2026
The City of Miami Beach is soliciting bids under 2026-424-DF for the 41st Street Corridor Revitalization Project, a G.O. Bond capital-improvement project rather than a grant program. The project will create a streetscape intended to improve pedestrian walkability with branded pavement, expanded shade-tree canopy, landscaping, street furnishings, entrance features and artwork along 41 Street from Alton Road to Pine Tree Drive and side streets from 40 Street to 42 Street. The City identifies an approximate $15 million budget divided into two tranches, and the solicitation was published on 08/14/2026 with bids closing on 09/28/2026 at 03:00 PM EDT.
CityPA
Posted
Sep 12, 2026
Oct 6, 2026
The Redevelopment Authority of Somerset County is soliciting sealed bids on behalf of the Borough of Garrett for construction of approximately 1,280 linear feet of new sidewalk and curbing along Center Street, from Jackson Street to Monroe Street. Bids are due October 6, 2026, at 1:30 P.M., with a non-mandatory pre-bid conference on September 24 and questions due September 30; contract documents and plans must be purchased from Appalachian Engineering Group, LLC. The project uses federal funds and includes MBE/WBE, Section 3, Davis-Bacon, equal-employment, and affirmative-action requirements, and it is a construction solicitation rather than a grant program.