Summary
The City of Tacoma is soliciting competitive bids to replace deteriorated sidewalks throughout its North End. The work includes demolition and removal of existing pavement, removal of contaminated soil, subgrade preparation, and installation of new concrete sidewalks (standard, colored, and scored), curb & gutter, traffic-control, and storm-water erosion-control measures, with historic-stamp preservation; the project budget is stated at $500,000 and the construction schedule is 50 working days after Notice to Proceed. Bidders must meet equity-in-contracting, LEAP local-employment, and Washington prevailing-wage requirements and provide a 5% bid bond plus insurance and performance/payment bonds; the bid deadline is 07/21/2026 at 11:00 AM PT.