CityPA
Posted
-
Oct 21, 2026
2026 Sanitary Sewer and Storm Sewer Rehabilitation Project
Contract A includes approx 3,460 LF of 8" cure-in-place mainline lining applying ultraviolet light. Contract B includes approx 125 VF full depth epoxy manhole lining. Contract C includes approx 1,040 LF of storm sewer line cleaning; 1,040 LF of pre-lining closed circuit television inspection; 850 LF of 18" cured-in-place storm sewer pipe lining.
