CityNY
Jul 28, 2026
Closes
Aug 26, 2026
Cured-in-Place Pipe (CIPP) Lining of Sanitary Sewer
Work include 420 LF furnish and install cured-in-place liner in 24" gravity sewer pipe; 260 LF furnish and install cured-in-place liner in 24" gravity sewer pipe; 75 LF furnish and install cured-in-place liner in 18-inch gravity sewer pipe; 25 EA internal reconnection of house service connections in cured-in-place lined gravity sewer pipe; 6 CY disposal of solids and debris resulting from the pre-cleaning of the sanitary sewer.