CityPA
Posted
Sep 17, 2026
Oct 6, 2026
2026 Road Program Kennedy Township
Project involves mill-and-overlay resurfacing on five roadway segments. Scope of work includes milling the existing pavement to a depth of two inches across the full roadway width gutter to gutter, performing base repairs where directed, adjusting existing manholes, inlets, and utilities, repairing asphalt wedge curb as needed, and placing a two-inch Superpave asphalt wearing course from curb to curb. The contractor is also responsible for maintenance and protection of traffic throughout the project, restoration of any disturbed lawn or grass areas, and replacement of pavement markings removed or disturbed during construction.