Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Webster City
Approx. 4,652 SY of 9" thick PCC patching, 443 SY of 10" thick PCC patching, 5,721 SY of 4" thick special backfill subbase (city furnished), 40 LF of 2.5-foot width 7" thick PCC curb and gutter, 70 LF of 4.0-foot width 8-inch thick PCC curb and gutter, 118 SY of driveway removal, 118 SY of 6" thick PCC driveway, 13 minor manhole adjustments, erosion control, and temporary traffic control.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Ontario
Work consists of pavement rehabilitation, includes, header & slot grinding existing pavement, placement of asphalt base pavement, placement of asphalt leveling course, placement of ARHM overlay, placement of PCC sidewalk, removal and replacement of PCC curb & gutter, ac berm, drive approaches, curb ramps, installation of detectable warning surfaces, adjustment of water valves & covers, adjustment of manhole rings & covers, installation of traffic signal loops, installation of video detection system, thermoplastic striping and marking removal and replacement, and installation and adjustment of other appurtenances.
Posted Date
Nov 6, 2025
Due Date
Dec 4, 2025
Release: Nov 6, 2025
City of Ontario
Close: Dec 4, 2025
Work consists of pavement rehabilitation, includes, header & slot grinding existing pavement, placement of asphalt base pavement, placement of asphalt leveling course, placement of ARHM overlay, placement of PCC sidewalk, removal and replacement of PCC curb & gutter, ac berm, drive approaches, curb ramps, installation of detectable warning surfaces, adjustment of water valves & covers, adjustment of manhole rings & covers, installation of traffic signal loops, installation of video detection system, thermoplastic striping and marking removal and replacement, and installation and adjustment of other appurtenances.
AvailableCity of Independence
The City of Independence, KS is seeking bids for pavement patching, curb and gutter patching, sidewalk replacement, and sidewalk ADA ramp replacement. The contract involves excavation, compacted granular stone, sawcutting, and cast-in-place concrete. Three contracts will be awarded for water/sewer, street department, and sidewalk repairs.
Posted Date
-
Due Date
Dec 18, 2025
City of Independence
Close: Dec 18, 2025
The City of Independence, KS is seeking bids for pavement patching, curb and gutter patching, sidewalk replacement, and sidewalk ADA ramp replacement. The contract involves excavation, compacted granular stone, sawcutting, and cast-in-place concrete. Three contracts will be awarded for water/sewer, street department, and sidewalk repairs.
AvailableCity of Raleigh
Project includes asphalt patching and pavement repair.
Posted Date
Nov 14, 2025
Due Date
Dec 15, 2025
Release: Nov 14, 2025
City of Raleigh
Close: Dec 15, 2025
Project includes asphalt patching and pavement repair.
AvailableLafayette Consolidated Government
Work includes patching of asphaltic concrete roadway or parking low failures and sealing cracks on existing asphalt streets within the incorporated limits of parish. The project will also include work to be done on an as needed, on call basis.
Posted Date
Nov 5, 2025
Due Date
Dec 4, 2025
Release: Nov 5, 2025
Lafayette Consolidated Government
Close: Dec 4, 2025
Work includes patching of asphaltic concrete roadway or parking low failures and sealing cracks on existing asphalt streets within the incorporated limits of parish. The project will also include work to be done on an as needed, on call basis.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis