CityGA
Jul 9, 2026
Closes
Aug 11, 2026
2026 Stormwater Repair Project RFP
Stormwater drainage improvements for the city including stormwater pipe lining and all labor and materials necessary to install the authorized work. 293 LF - 18" CIPP - UV cured, 5.5mm; 133 LF - 30" CIPP - UV cured, 9.0 mm; 423 LF - 48" CIPP - UV cured, 14.5mm.