CityPA
Aug 6, 2026
Closes
Aug 25, 2026
2026 Road Improvement Project RFP
Road improvement. The Work generally consists of furnishing all equipment, labor and materials for, but not necessarily limited to, the following: 60 lb./SY 9.5 MM leveling course, 1 1/2" bituminous overlay of 9.5 mm wearing course, 3' wide 1 1/2"” to 0” curb side milling, design and installation of ADA compliant curb ramps, 6" depth milling, 3" of 19 mm bituminous wearing course (fine graded), placement of 6" of 2A stone subbase, and incidental milling and sealing.