Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
DESIGN-BUILD: Design and construction of a 32' x 65' pole building extension for the city. Components of the construction include: site grading; setting posts on a concrete foundation; concrete floor; wood wall and trusses; steel siding and roofing; doors; and electrical. In addition, the City of Greenville desires to include two rafter-supported garment storage and conveyance systems as an additive alternate to the bid.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
DESIGN-BUILD: Work includes comprehensive design, construction, and rehabilitation of the historic Lowell Pool and its planned addition.
Posted Date
Oct 28, 2025
Due Date
Dec 17, 2025
Release: Oct 28, 2025
Close: Dec 17, 2025
DESIGN-BUILD: Work includes comprehensive design, construction, and rehabilitation of the historic Lowell Pool and its planned addition.
AvailablePremium
Access the largest public sector contact database
DESIGN-BUIlD The remediation, structural replacement, Historical window and siding installation, and interior finish.
Posted Date
Nov 7, 2025
Due Date
Dec 16, 2025
Release: Nov 7, 2025
Close: Dec 16, 2025
DESIGN-BUIlD The remediation, structural replacement, Historical window and siding installation, and interior finish.
AvailableDesign-Build Exterior Building Maintenance and Fall Protection System. To provide proposals to design and install the new Exterior Building Maintenance and Fall Protection systems at the project.
Posted Date
Nov 19, 2025
Due Date
Dec 12, 2025
Release: Nov 19, 2025
Close: Dec 12, 2025
Design-Build Exterior Building Maintenance and Fall Protection System. To provide proposals to design and install the new Exterior Building Maintenance and Fall Protection systems at the project.
Design-Build: Work includes Design, furnish, and installation of new insulated attic space, membrane roofing system, rain gutters, downspouts, metal coping, and edge metal conforming to all applicable codes. Access to the new attic space is required for maintenance, operations, and future replacements. New roofing system shall carry a 20-year minimum warranty covering materials, workmanship, wind speeds up to 90 mph and a hail writer covering up to 1,5” hail. • Design, furnish, and installation of a new residential-type HVAC system capable of providing heating and cooling to the entire facility and fitting the new attic space. The new HVAC shall conform to all applicable codes. • Demolition and removal of existing baseboard heaters and associated electrical components. Utilize existing electrical outlets where required.
Posted Date
Nov 21, 2025
Due Date
Jan 16, 2026
Release: Nov 21, 2025
Close: Jan 16, 2026
Design-Build: Work includes Design, furnish, and installation of new insulated attic space, membrane roofing system, rain gutters, downspouts, metal coping, and edge metal conforming to all applicable codes. Access to the new attic space is required for maintenance, operations, and future replacements. New roofing system shall carry a 20-year minimum warranty covering materials, workmanship, wind speeds up to 90 mph and a hail writer covering up to 1,5” hail. • Design, furnish, and installation of a new residential-type HVAC system capable of providing heating and cooling to the entire facility and fitting the new attic space. The new HVAC shall conform to all applicable codes. • Demolition and removal of existing baseboard heaters and associated electrical components. Utilize existing electrical outlets where required.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis