Summary
Works include approx. 101,600 CY unclassified excavation; 1,320 TN asphalt binder pg 70-28; 53,900 SY saw cut grooving; 1 EA new 72" storm drain structure; 17,930 LF of install non-encased, electrical conduit, 1 way 2" sch 40 PVC conduit. 1 LS mobilization (not to exceed 10%); 1 LS taxes, bonds and insurance (not to exceed 2%); 1 LS traffic control (CSPP requirements) (not to exceed 3%); 1 LS contractor quality control program (CQCP) (not to exceed 3%); 9,050 SY remove asphalt by cold milling - variable depth; 16 EA remove and salvage existing taxiway edge light; 4 EA remove and salvage existing runway guard light; 1 LS irrigation modifications; 4 EA remove and salvage existing airfield sign. See attached file.