Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Fort Wayne International Airport
Work includes minor concrete pavement repairs on the air trade center apron. Work generally includes repair of joint and corner spalls, cleaning and resealing of longitudinal and transverse joints, and other associated concrete pavement restoration items. Description: 1 ls of mobilization; 6000 LFT of clean and seal longitudinal and transverse joints in existing PCCP; 140 LFT of clean and seal expansion/isolation joints in existing PCCP; 100 LFT of route and seal cracks in existing PCCP (undistributed); 500 SFT of existing pccp joint spall repair (equal to or less than 4" depth); 30 SFT of existing PCCP corner spall repair (equal to or less than 4" depth).
Posted Date
Jul 17, 2026
Due Date
Aug 6, 2026
Release: Jul 17, 2026
Fort Wayne International Airport
Close: Aug 6, 2026
Work includes minor concrete pavement repairs on the air trade center apron. Work generally includes repair of joint and corner spalls, cleaning and resealing of longitudinal and transverse joints, and other associated concrete pavement restoration items. Description: 1 ls of mobilization; 6000 LFT of clean and seal longitudinal and transverse joints in existing PCCP; 140 LFT of clean and seal expansion/isolation joints in existing PCCP; 100 LFT of route and seal cracks in existing PCCP (undistributed); 500 SFT of existing pccp joint spall repair (equal to or less than 4" depth); 30 SFT of existing PCCP corner spall repair (equal to or less than 4" depth).
AvailableFort Wayne International Airport
Work includes roof replacement.
Posted Date
-
Due Date
Jul 14, 2026
Fort Wayne International Airport
Close: Jul 14, 2026
Work includes roof replacement.
Fort Wayne International Airport
Professional visual artists or teams to design, fabricate and install three-dimensional wall-or ceiling-hung art inside the terminal in the “meeter greeter” space near baggage claim and the welcome center. The purpose of the artwork is to enhance the "meeter greeter" space by creating a welcoming and visually engaging piece that reflects Fort Wayne's rich aviation history.
Posted Date
Jun 5, 2026
Due Date
Jul 17, 2026
Release: Jun 5, 2026
Fort Wayne International Airport
Close: Jul 17, 2026
Professional visual artists or teams to design, fabricate and install three-dimensional wall-or ceiling-hung art inside the terminal in the “meeter greeter” space near baggage claim and the welcome center. The purpose of the artwork is to enhance the "meeter greeter" space by creating a welcoming and visually engaging piece that reflects Fort Wayne's rich aviation history.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Controller (also serves as Airport Authority Treasurer; Interim Chief Financial Officer as of Jan 20, 2026 board meeting)
Premium
Access the largest public sector contact database
© 2026 Starbridge