Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Gallatin Airport Authority
Works include approx. 101,600 CY unclassified excavation; 1,320 TN asphalt binder pg 70-28; 53,900 SY saw cut grooving; 1 EA new 72" storm drain structure; 17,930 LF of install non-encased, electrical conduit, 1 way 2" sch 40 PVC conduit. 1 LS mobilization (not to exceed 10%); 1 LS taxes, bonds and insurance (not to exceed 2%); 1 LS traffic control (CSPP requirements) (not to exceed 3%); 1 LS contractor quality control program (CQCP) (not to exceed 3%); 9,050 SY remove asphalt by cold milling - variable depth; 16 EA remove and salvage existing taxiway edge light; 4 EA remove and salvage existing runway guard light; 1 LS irrigation modifications; 4 EA remove and salvage existing airfield sign. See attached file.
Posted Date
Feb 18, 2026
Due Date
Mar 12, 2026
Release: Feb 18, 2026
Gallatin Airport Authority
Close: Mar 12, 2026
Works include approx. 101,600 CY unclassified excavation; 1,320 TN asphalt binder pg 70-28; 53,900 SY saw cut grooving; 1 EA new 72" storm drain structure; 17,930 LF of install non-encased, electrical conduit, 1 way 2" sch 40 PVC conduit. 1 LS mobilization (not to exceed 10%); 1 LS taxes, bonds and insurance (not to exceed 2%); 1 LS traffic control (CSPP requirements) (not to exceed 3%); 1 LS contractor quality control program (CQCP) (not to exceed 3%); 9,050 SY remove asphalt by cold milling - variable depth; 16 EA remove and salvage existing taxiway edge light; 4 EA remove and salvage existing runway guard light; 1 LS irrigation modifications; 4 EA remove and salvage existing airfield sign. See attached file.
Gallatin Airport Authority
Provide financial and compliance audit services.
Posted Date
Jan 18, 2025
Due Date
Jan 31, 2025
Release: Jan 18, 2025
Gallatin Airport Authority
Close: Jan 31, 2025
Provide financial and compliance audit services.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Gallatin Airport Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database