Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of services for tree clearing, temporary fence installation, stabilized construction exit, and sediment control log installation for the Nine Mile Creek Corridor Renewal Project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Create a multifunctional corridor. Construction of an approximately half-mile long multi-functional corridor parallel to and crossing laguna creek. The multi-functional corridor will be elevated above existing ground surface elevation by approximately 2 feet. The surface of the corridor will include a 10-foot-wide paved surface with 2-feet wide decomposed granite shoulders. Post-and-cable fencing will be installed at the edges of the unpaved shoulders. Two prefabricated steel truss bridges with concrete decks will provide necessary access across laguna creek. Additional project features include construction of two floodway excavation areas to offset the floodplain encroachments from the elevated multi-functional corridor. See outside link.
Posted Date
Dec 18, 2025
Due Date
Feb 17, 2026
Release: Dec 18, 2025
Close: Feb 17, 2026
Create a multifunctional corridor. Construction of an approximately half-mile long multi-functional corridor parallel to and crossing laguna creek. The multi-functional corridor will be elevated above existing ground surface elevation by approximately 2 feet. The surface of the corridor will include a 10-foot-wide paved surface with 2-feet wide decomposed granite shoulders. Post-and-cable fencing will be installed at the edges of the unpaved shoulders. Two prefabricated steel truss bridges with concrete decks will provide necessary access across laguna creek. Additional project features include construction of two floodway excavation areas to offset the floodplain encroachments from the elevated multi-functional corridor. See outside link.
AvailableWorkmanlike manner remove 42 ash trees, grind stumps, and restore the terrace.
Posted Date
Dec 10, 2025
Due Date
Jan 15, 2026
Release: Dec 10, 2025
Close: Jan 15, 2026
Workmanlike manner remove 42 ash trees, grind stumps, and restore the terrace.
AvailableProcurement of tree trimming and removal services for the electrical distribution system.
Posted Date
Dec 30, 2025
Due Date
Jan 29, 2026
Release: Dec 30, 2025
Close: Jan 29, 2026
Procurement of tree trimming and removal services for the electrical distribution system.
AvailableThe Village of Mount Prospect is soliciting contractors to provide parkway and other public-area tree removal services under an Invitation to Bid for a 24-month contract (Feb 4, 2026 to Dec 31, 2027) with an option to extend one year. The solicitation requests pricing by diameter-inch for multiple tree size classes, requires updated certificates/licenses and a bid bond, and lists Dave Hull (Forestry/Grounds Superintendent) as the contact. The bid was posted Jan 5, 2026 and is due Jan 20, 2026 at 1:00 PM Central; this is an active ITB (not a grant).
Posted Date
Jan 5, 2026
Due Date
Jan 20, 2026
Release: Jan 5, 2026
Close: Jan 20, 2026
The Village of Mount Prospect is soliciting contractors to provide parkway and other public-area tree removal services under an Invitation to Bid for a 24-month contract (Feb 4, 2026 to Dec 31, 2027) with an option to extend one year. The solicitation requests pricing by diameter-inch for multiple tree size classes, requires updated certificates/licenses and a bid bond, and lists Dave Hull (Forestry/Grounds Superintendent) as the contact. The bid was posted Jan 5, 2026 and is due Jan 20, 2026 at 1:00 PM Central; this is an active ITB (not a grant).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis