Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project consist of approx 115 VF 28" drill bore hole; 102 VF 16" PVC casing; 146 6" PVC fence; 50 LF 6" DIP water main; 927 LF 8" PVC water main via directional boring; 1,053 LF 10" PVC water main via directional boring; 30 SY 8" concrete pavement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Release: Nov 10, 2025
Close: Jan 5, 2026
Water main improvements.
AvailablePremium
Access the largest public sector contact database
Procurement for the construction and installation of Raw Water Intake Pump Station Improvements 2025, including replacement of a butterfly valve, gate actuator, submerged coarse bar screen, addition of a screen deflector unit, associated electrical work, and temporary bypass pumping.
Posted Date
-
Due Date
Jan 7, 2026
Close: Jan 7, 2026
Procurement for the construction and installation of Raw Water Intake Pump Station Improvements 2025, including replacement of a butterfly valve, gate actuator, submerged coarse bar screen, addition of a screen deflector unit, associated electrical work, and temporary bypass pumping.
AvailableProcurement and installation of Supervisory Control and Data Acquisition (SCADA) system improvements, including Remote Terminal Units (RTUs) for pump stations, tanks, and valve vaults, pressure transducers, and electrical services.
Posted Date
Mar 1, 2025
Due Date
Dec 31, 2025
Release: Mar 1, 2025
Close: Dec 31, 2025
Procurement and installation of Supervisory Control and Data Acquisition (SCADA) system improvements, including Remote Terminal Units (RTUs) for pump stations, tanks, and valve vaults, pressure transducers, and electrical services.
AvailableConstruction consists on installing 8,334 L.F. of 8" PVC Water Main and 1,135 LF of 2" PVC Water Main, connection to existing water main via tapping sleeve and valve, erosion control, traffic control, and all associated measures for the complete project.
Posted Date
Nov 25, 2025
Due Date
Jan 8, 2026
Release: Nov 25, 2025
Close: Jan 8, 2026
Construction consists on installing 8,334 L.F. of 8" PVC Water Main and 1,135 LF of 2" PVC Water Main, connection to existing water main via tapping sleeve and valve, erosion control, traffic control, and all associated measures for the complete project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis