Ashland, NE 2026 WWTF Screening Improvements RFP
Posted
-
Dec 10, 2026
Removal of the existing non-operational auger grinder and installation of a new vertical screen unit. Installation of a wash press unit on the main level of the headworks building. Electrical and ventilation improvements on the main level of the headworks building. Structural modifications to the roof to accommodate installation of the vertical screen unit.

