Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction consists on installing 8,334 L.F. of 8" PVC Water Main and 1,135 LF of 2" PVC Water Main, connection to existing water main via tapping sleeve and valve, erosion control, traffic control, and all associated measures for the complete project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Release: -
Close: Feb 5, 2026
Avenue improvements and water main.
AvailableProject includes the total replacement of all water mains, along with new service lines to the current meter location in the structures, and miscellaneous associated work.
Posted Date
Jan 21, 2026
Due Date
Feb 10, 2026
Release: Jan 21, 2026
Close: Feb 10, 2026
Project includes the total replacement of all water mains, along with new service lines to the current meter location in the structures, and miscellaneous associated work.
AvailableWork includes approx 7,595 LF 8" DIP class 52 with polyethylene wrap water main; 300 LF 8" DIP class 52 with polyethylene wrap water main by directional bore; 2,640 LF 1" PEX water service pipe by directional bore; 10 EA 6" PVC SDR-26 D2241 sanitary sewer service repair. See outside link.
Posted Date
Dec 22, 2025
Due Date
Feb 9, 2026
Release: Dec 22, 2025
Close: Feb 9, 2026
Work includes approx 7,595 LF 8" DIP class 52 with polyethylene wrap water main; 300 LF 8" DIP class 52 with polyethylene wrap water main by directional bore; 2,640 LF 1" PEX water service pipe by directional bore; 10 EA 6" PVC SDR-26 D2241 sanitary sewer service repair. See outside link.
AvailableThe Village of Gurnee, Illinois is soliciting sealed bids for the Estes Region Water Main Improvements, including installation of approximately 6,720 feet of 6‑inch and 2,770 feet of 8‑inch PVC water main, valves, hydrants, service connections, and related storm sewer and restoration work. Bids will be accepted only from contractors pre‑qualified by the Owner and meeting IDOT drainage pre‑qualification; bid documents will be distributed via the Village’s LiquidFiles FTP upon pre‑qualification. Sealed bids are due by 10:30 AM on February 9, 2026, at the Village’s Engineering office.
Posted Date
Jan 5, 2026
Due Date
Feb 9, 2026
Release: Jan 5, 2026
Close: Feb 9, 2026
The Village of Gurnee, Illinois is soliciting sealed bids for the Estes Region Water Main Improvements, including installation of approximately 6,720 feet of 6‑inch and 2,770 feet of 8‑inch PVC water main, valves, hydrants, service connections, and related storm sewer and restoration work. Bids will be accepted only from contractors pre‑qualified by the Owner and meeting IDOT drainage pre‑qualification; bid documents will be distributed via the Village’s LiquidFiles FTP upon pre‑qualification. Sealed bids are due by 10:30 AM on February 9, 2026, at the Village’s Engineering office.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis