Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement and installation of Supervisory Control and Data Acquisition (SCADA) system improvements, including Remote Terminal Units (RTUs) for pump stations, tanks, and valve vaults, pressure transducers, and electrical services.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Project includes the following Work: Furnish all labor, materials, equipment, and incidentals required and construct the improvements in their entirety as shown on the Plans and as specified herein. The Work may include, but is not necessarily limited to, the following: 1.the installation of tank site RTUs, pump station RTUs, and solenoid control valve RTUs throughout the Clinton - Bee Branch Water Distribution System 2.the installation of new single phase electric services at various RTU sites as indicated 3.miscellaneous appurtenances 4.mobilization & demobilization 5.items of construction work and/or materials not specifically addressed herein, but nonetheless required for a complete, operating, and acceptable installation of the work, shall be considered subsidiary to the lump sum bid item, and the cost thereof shall be included therein.
Posted Date
Sep 5, 2025
Due Date
Jan 15, 2026
Premium
Access the largest public sector contact database
Close: Jan 15, 2026
Project includes the following Work: Furnish all labor, materials, equipment, and incidentals required and construct the improvements in their entirety as shown on the Plans and as specified herein. The Work may include, but is not necessarily limited to, the following: 1.the installation of tank site RTUs, pump station RTUs, and solenoid control valve RTUs throughout the Clinton - Bee Branch Water Distribution System 2.the installation of new single phase electric services at various RTU sites as indicated 3.miscellaneous appurtenances 4.mobilization & demobilization 5.items of construction work and/or materials not specifically addressed herein, but nonetheless required for a complete, operating, and acceptable installation of the work, shall be considered subsidiary to the lump sum bid item, and the cost thereof shall be included therein.
AvailableRelease: Nov 10, 2025
Close: Jan 5, 2026
Water main improvements.
AvailableThe Inc. Village of Hempstead is soliciting bids for Water Infrastructure Improvements (Contract No. 1 – Water Mains – Phase 0) to upgrade water transmission infrastructure. There is a non-mandatory pre-bid meeting on 2025-12-03 and the solicitation closes on 2025-12-16 at 11:00 AM EST; bidders must submit physical bids and direct questions to the listed contact by 2025-12-11.
Posted Date
Nov 14, 2025
Due Date
Dec 16, 2025
Release: Nov 14, 2025
Close: Dec 16, 2025
The Inc. Village of Hempstead is soliciting bids for Water Infrastructure Improvements (Contract No. 1 – Water Mains – Phase 0) to upgrade water transmission infrastructure. There is a non-mandatory pre-bid meeting on 2025-12-03 and the solicitation closes on 2025-12-16 at 11:00 AM EST; bidders must submit physical bids and direct questions to the listed contact by 2025-12-11.
AvailableConstruction consists on installing 8,334 L.F. of 8" PVC Water Main and 1,135 LF of 2" PVC Water Main, connection to existing water main via tapping sleeve and valve, erosion control, traffic control, and all associated measures for the complete project.
Posted Date
Nov 25, 2025
Due Date
Jan 8, 2026
Release: Nov 25, 2025
Close: Jan 8, 2026
Construction consists on installing 8,334 L.F. of 8" PVC Water Main and 1,135 LF of 2" PVC Water Main, connection to existing water main via tapping sleeve and valve, erosion control, traffic control, and all associated measures for the complete project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis