Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Remove approx 2,500 dry tons Class B municipal biosolids from one, clay-lined, wastewater lagoon located at the Independence WWTP.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Town of Hinesburg is soliciting proposals for the removal, dewatering, and disposal of accumulated sludge from three wastewater lagoons at the Hinesburg Wastewater Treatment Facility in Hinesburg, Vermont. Proposers must register via email with the Engineer (Aldrich + Elliott, PC) to receive addenda and may submit sealed physical packages or PDF submittals to the Engineer (jbooth@aeengineers.com). The solicitation is posted on the Vermont Business Registry and is open (not a grant), with questions due 2025-12-29 and a bid closing on 2026-01-27 at 2:00 PM local time.
Posted Date
-
Due Date
Jan 27, 2026
Close: Jan 27, 2026
The Town of Hinesburg is soliciting proposals for the removal, dewatering, and disposal of accumulated sludge from three wastewater lagoons at the Hinesburg Wastewater Treatment Facility in Hinesburg, Vermont. Proposers must register via email with the Engineer (Aldrich + Elliott, PC) to receive addenda and may submit sealed physical packages or PDF submittals to the Engineer (jbooth@aeengineers.com). The solicitation is posted on the Vermont Business Registry and is open (not a grant), with questions due 2025-12-29 and a bid closing on 2026-01-27 at 2:00 PM local time.
Premium
Access the largest public sector contact database
Sludge removal contractors for the removal, dewatering, and disposal of accumulated sludge from three wastewater lagoons.
Posted Date
Dec 10, 2025
Due Date
Jan 27, 2026
Release: Dec 10, 2025
Close: Jan 27, 2026
Sludge removal contractors for the removal, dewatering, and disposal of accumulated sludge from three wastewater lagoons.
AvailableWastewater treatment facility (WWTF) expansion.
Posted Date
Oct 23, 2025
Due Date
Jan 8, 2026
Release: Oct 23, 2025
Close: Jan 8, 2026
Wastewater treatment facility (WWTF) expansion.
AvailableThe work shall consist of furnishing all labor, equipment, and materials, and performing all work necessary for construction of the following: A two cell, non-discharging wastewater lagoon facility and a submersible sanitary sewer pump station. Work includes approximately 38,097 cubic yards of common excavation; 917 cubic yards of Contractor furnished common excavation; 31,211 cubic yards of compacted fill; 278 tons of pond sealant (bentonite); 4021 square yards of stone riprap slope protection; an influent structure; 284 linear feet of 8-inch DIP piping; 4486 linear feet of 8-inch PVC force main; 2271 linear feet of fencing; a duplex, submersible wastewater pump station; and all other incidental and appurtenant work required to complete the improvements
Posted Date
Dec 2, 2025
Due Date
Jan 14, 2026
Release: Dec 2, 2025
Close: Jan 14, 2026
The work shall consist of furnishing all labor, equipment, and materials, and performing all work necessary for construction of the following: A two cell, non-discharging wastewater lagoon facility and a submersible sanitary sewer pump station. Work includes approximately 38,097 cubic yards of common excavation; 917 cubic yards of Contractor furnished common excavation; 31,211 cubic yards of compacted fill; 278 tons of pond sealant (bentonite); 4021 square yards of stone riprap slope protection; an influent structure; 284 linear feet of 8-inch DIP piping; 4486 linear feet of 8-inch PVC force main; 2271 linear feet of fencing; a duplex, submersible wastewater pump station; and all other incidental and appurtenant work required to complete the improvements